Project
2 — 3.5 MG San Pablo Clearwell & Rate Control Station Replacement Kensington, CA
- Location: Kensington, California
- Market: Water
- Year Built: 2022
- Capacity: 3.50 MG
- Liquid Depth: 22.5'
- Diameter: 173.5'
- Purpose: DN Tanks was hired by East Bay MUD to replace a 5.4 MG San Pablo clearwell with two 3.5 MG prestressed concrete tanks. DN tanks will also rehabilitate portions of the San Pablo Water Treatment Plant both of which are located within EBMUD's San Pablo Water Treatment Plant site in Kensington.
- Application: Ground Storage - Type I