• Location: Dallas, Texas
  • Market: Water
  • Year Built: 2 -2010, 2012, 2013
  • Capacity: 16.0 MG
  • Liquid Depth: 24.58'
  • Diameter: 333'
  • Purpose: DN Tanks was responsible for the construction of four 16.0 MG Clearwells at DWU’s East Side wastewater treatment plant expansion. DN Tanks assumed design and construction responsibility for the tanks along with the Auger Cast Pile (ACP) Foundation System and Reinforced Concrete Inlet and Outlet Flumes.
  • Application: Clearwell - Type III
Contact a Representative today.
Contact a Representative today.
Kyle  Leininger

Kyle Leininger

Senior Regional Manager, Central Region